

Flawlessly Move a Heavy and Fully Rigged Camera Package
in any direction with Stability & Comfort!
With the grand popularity of Flycam Flowline series, Flycam launches an unbeatable combination of flowline with a stabilizing arm for an unforgettable filming experience. Ergonomically designed flowline ensures comfort by reducing the static load on the neck and shoulder muscles, distributing it to other parts of the body. Flycam Placid, a two axis spring arm ensures stability and smoothness by controlling the vibrations. It works great with the gimbal rigs like Free fly Mövi or most other gimbal rigs.

"WHAT YOU SEE IS WHAT YOU GET"

Video is for demonstration only
Actual Product may vary due to Product Improvements
Flycam Flowline
A Professional Ergonomic Stabilizing Camera Support which ensures comfort & lets you shoot 24x7. The Body Vest is made with soft padded breathable fabric which provides immense comfort. Another great feature of the vest is that it has flexible belt system & adjustable vest rods on sides which allow easy fit for all body types.The Top Bar with 360° Rotation capability allows easy camera movements in different angles. The body-mounted support system comes with a powerful suspension rope which is attached to your camera with a rubber-grip hook. The rope enables you to take the ground level shots. It also delivers the hands-free operation giving absolute rest to the hands while retaining stability and control. Flowline is properly packed in a protective bag pack to ensure the safety of the product & for travel convenience.

Flowline Placid
The FLOWLINE placid is a two-axis spring arm stabilizer that attaches at the end of the flowline arm. It smoothen video results by mitigating vertical vibrations induced by walking or running during a tracking shot. It also stabilizes side to side motion in similar tracking situations by counter-pivoting around its center axis. It also allows you to go from high to low mode and to control the vertical and side to side stabilization simultaneously.

Spring Tensioner
You can change the tension spring according to weight of your camera setup whether it is low, medium or heavy one as mentioned in the picture.

IMAGE GALLERY

Placid is a Must Have Product for Flowline!!

Works great with the gimbal rigs like Free fly Mövi or most other gimbal rigs.
The Supportive accessories are for demonstration purpose only.
- Flowline Weight: Complete 3.6 kg (8 lb)
- Shoulder Mount Rig Weight : 1.8kg (3.96 lb)
- Height: Mounted: 100 cm (39.4 in) Folded: 60 cm (23.6 in)
- Minimum Load Capacity:3 kg(6.6 lb)
- Maximum Load Capacity:7.5 kg(16.53 lb)
- Suspension line length (Rope): 152.5 cm (60 in.) when fully stretched
- Top Bar Length: 560mm
- Top Bar Rotation: 360°
- Min. waist hip strap length: 81 cm (32 in)
- Max. waist hip strap length: 125 cm (49 in)
Specification of Placid
- Weight of product: 2kg/ 4.4lb
- Material: Aluminum, Carbon Steel, Stainless Steel, EPDM rubber
- Min Load Required: 5kg/ 11lb
- Max Load: 20Kg / 44lb
- Height: 205mm
- Width: 395 mm
- Depth: 65mm
- FLYCAM Basic Flowline with 360° Rotation (B-FLCM-FLN)
- FLYCAM Flowline Placid Two Axis Spring Arm (FLCM-FLN-PLA)
- 2 x Tension Spring
- Safety shock cord
- Protective Storage Bag
Q: Does this come with the shoulder rig?
Ans: No, the shoulder rig is not included with this Flowline model.
Q: Is this model ideal for gimbal and dslr or should i get something with heavier weight capacity?
Ans: This Flowline is designed for total weight capacity from 3kg to 7.5kg. If your total setup weight (camera and gimbal weight) is within 3kg to 7.5kg, then this model will perfectly work with your setup. Incase your total setup weight exceeds this weight limit, We have other flowline models that are compatible with heavier weight range.
Q: What body sizes it will fit to?
Ans: It will fit to all body sizes from 28” to 56”.
Q: Can I use cage with this flowline?
Ans: Yes, you can use a cage with this flowline.
Q: Can I purchase extra spring of higher strength to change and use heavier camera with it?
Ans: No, we don’t sell extra springs of higher strength with this Flowline. We have other flowline models that are compatible with heavier weight range.
Q: What is the weight of the Flowline?
Ans: The Flycam Flowline itself weighs 3.6kg.
Q: For how long can I use it continuously?
Ans: This Flycam Flowline system can be used for whole day without any fatigue.
Q: Can I use the Flowline placid arm with this Flycam flowline?
Ans: Yes, you can use the Flowline placid arm with this Flycam flowline model.
Q: Can I purchase extra spring of higher strength to change and use heavier camera with it?
Ans: We provide 2 springs with this spring arm i.e. 5-12kg and 12-20kg.
Q: Will this wok with my easyrig model?
Ans: Yes, this will work with your easyrig model. You just need to drill a hole for mounting the placid arm onto your rig.
Q: Does it come in bag packing?
Ans: Yes, this Flycam Flowline comes in a bag packing for easy transportation. But the Flycam flowline Placid does not include a bag. The complete components of placid arm are packed in a foam packing box for safe storage.
Q: Is it returnable for a full refund if it doesn’t meet my expectations upon delivery?
Ans: Yes, absolutely. We always backup our sales. In case, you don't like the product, we take it back within 14 days and you get a 100% refund.
Q: What is the warranty?
Ans: We provide 1 year warranty from the date of purchase. Items which are covered by the warranty period will be replaced at no cost to the customer. Replacement parts of the product will be provided at nominal cost (covering the cost price of the replacement parts only) to the customers after the Warranty Period has expired.