Skip to content

Flycam Flowline Starter for Camera & Gimbals (3-7.5kg/6-16lb) with Stabilizing Arm

Body Support Rig w 180° Rotation. For Filmmakers & Videographers.

Original price US $797.00 - Original price US $797.00
Original price
US $797.00
US $797.00 - US $797.00
Current price US $797.00
SKU : FLCM-FLN-PA-01

ASSURED SMOOTH STABILIZED SHOTS & COMFORT ALL DAY LONG!

01.

BACKBREAKER HAND-HELD WORK – NOT ANYMORE
We understand extended handheld camerawork can prove to be a backbreaker. But if you have a Body Support rig, it solves your problem up to a great extent.
Flycam Flowline rig takes the weight off your shoulders & arms and distributes it across the entire back which makes it convenient for you to shoot for a longer period without getting tired.
As there is less pressure on your arms now, you’ll be able to capture more stable & smoother shots.

Flycam Flowline Starter for Camera & Gimbals (3-7.5kg/6-16lb) with Stabilizing Arm
Flycam Flowline Starter for Camera & Gimbals (3-7.5kg/6-16lb) with Stabilizing Arm

02.

ERGONOMIC, ADAPTABLE & EASY TO BALANCE
You feel comfortable & stress-free all day long due to its ergonomic & breathable soft harness.
It gives you the freedom to capture a shot from any desired angle as it rotates 180°.
This Flowline System accommodates all Camera and Gimbal Setups between 3kg to 7.5kg (6lb-16lb). You can adjust the spring tension to balance the setup by easily turning the knob present on the rig's back.

03.

PERFECT VERTICAL STABILIZATION!
The Flycam Placid 2-axis Spring Arm is a perfect companion for your flowline rig in getting a Smooth Shot. It adds an additional vertical stabilization & eliminates errors caused by the operator’s motion.
It adapts a varied range of setups weighing b/w 5kg/11lb to 20kg/44lb. It comes with two springs for variable payloads. You can interchange them as per the weight of your camera setup.
You can balance the setup & adjust the spring tension by adjustment knob.

Flycam Flowline Starter for Camera & Gimbals (3-7.5kg/6-16lb) with Stabilizing Arm
Flycam Flowline Starter for Camera & Gimbals (3-7.5kg/6-16lb) w Stabilizing Arm

04.

QUALITY THAT LASTS LONG
The body vest is made up of strong yet ergonomic fabric that has minimal wear & tears & stays for long.
The arm pole of the flowline rig & the placid arm are constructed with high-grade Aluminum Alloy that ensures stability, strength & durability.
The Springs used in the Placid are made up of Stainless Steel that certifies complete corrosion resistance & long-term value.

IN-ACTION VIDEOS

SPECIFICATIONS


FLOWLINE

Flowline Weight

  3.6 kg/8 lb

Shoulder Mount Rig Weight

  1.8kg/3.96 lb

Height

    Mounted: 100 cm  
    Folded: 60 cm

Minimum Load Capacity

  3 kg/6.6 lb

Maximum Load Capacity

  7.5 kg/16.53 lb

Suspension line length (Rope)

    152.5 cm

Top Bar Length

  560mm

Top Bar Rotation

  180°

Min. waist hip strap length

  81 cm

Max. waist hip strap length

  125 cm

PLACID ARM

Construction

  High-grade Aluminum, Carbon Steel, Stainless Steel, EPDM rubber

Height

  205mm

Width

  395 mm

Depth

  65mm

Max Load

  5kg/ 11lb

Weight of product

  1.80kg / 3.96lb

Foam Packing Dimension

  LxWxH : 42cmx20.5cmx12cm

Weight(With packing)

  2.40kg/5.29lb

IN THE BOX

FLYCAM Basic Flowline with 180° Rotation (B-FLCM-FLN-01)
FLYCAM Flowline Placid Two Axis Spring Arm (FLCM-FLN-PLA))
2 x Tension Spring
Safety shock cord
Protective Storage Bag


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products


Q&A

Have a Question?

Ask a Question



x