Skip to content

Free Fast Shipping to Canada (Except Pre-order Products)

Free Fast Shipping to Canada (Except Pre-order Products)

Flycam Flowline Master with Pro Vest

for Camera & Gimbals (4-12kg/9-27lb)

Sold out
Original price CAD 1,338.00 - Original price CAD 1,338.00
Original price
CAD 1,338.00
CAD 1,338.00 - CAD 1,338.00
Current price CAD 1,338.00
SKU : FLCM-FLN-MSTR-03

AT A GLANCE


Payload
Up to 12kg
Support Arm Rotation
180°
Waist hip strap length
Min-Max: 87 cm - 107 cm
Compatible With
Camera Gimbals and Handheld Stabilization Setups
Best For
Moving Shots
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline Master takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
NOTE: It is recommended to attach the minimum required weight (4kg / 9lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Master with Pro Vest
Flycam Flowline Master with Pro Vest

02.

THE FLOWLINE MASTER VEST
The Flowline Master Vest has Multiple Layers of Padding which ensures more support around the waist, allowing you to mount large setups and shoot for longer duration comfortably. It has a flexible belt system & adjustable vest rods on sides which will enable a comfortable fit for all body types.

03.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Support Rope also adds a point of Contact which reduces Vibrations.

Flycam Flowline Master with Pro Vest
Flycam Flowline Master with Pro Vest

04.

ADAPTIVE CAMERA SUPPORT RIG
This Flowline Master System fits multiple Camera and Gimbal Setups between the weight range of 4kg / 9lbs to 12kg / 27lbs.You can even adjust the spring tension to balance the load placed on the Support Rope by turning the knob present on the back of the rig.
Also, the top bar allows for 180° rotation to capture shots with incredible freedom of movement.

05.

BUILT TO LAST
We know set life can take a toll on your gear. Built with the highest quality materials, the Flycam Flowline Master is sure to last you a lifetime. It comes in a high-quality protective bag that lets you easily carry it with you around the world.

Flycam Flowline Master with Pro Vest

IN-ACTION VIDEOS

SPECIFICATIONS

Payload Capacity

Min-Max: 4kg - 12kg (9lb - 27lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Support Arm Rotation

  180°

Knob Type

  Anti Slip Ratchet Knob

Height Mounted

  100cm | 39.4inch
  Folded: 60cm | 23.6inch

Suspension Line 

   Material: 3mm Nylon
   Length (Rope): 152.5cm | 60 in When fully stretched

Top Bar

   Length Including Extension: 46cm | 18inch
   Length Excluding Extension: 32cm | 13inch

Waist hip strap length

  Min-Max: 87cm - 107cm (34inch-42inch)

Extension Length

  14cm | 5.5inch

Product Weight (without packing)

  5.6kg / 12.5lb

Product Weight (with packing)

  28kg / 61.8lb

IN THE BOX

Flycam Flowline Master With Pro Vest (4-12kg / 9-27lb)
Bag

USER MANUAL


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products





  • Is there an option for 30" inches or less of waist?

    The FLYCAM Flowline Master with Pro Vest for Camera & Gimbals (9-27 lb) is only recommended for persons with a waist size of 34-42". However, you may want to consider the FLYCAM Galaxy Arm and Vest Stabilizeras it can fit on waists 28-60".

  • How do i adjust the height?

    You can get the optional height riser for vertical extension of the top bar.
    Product name: Flycam Height Riser for Flowline Body Support Rigs(FLN-HR-4)

  • Belt or waist size is about 34" inches minimum at stays in specs. My waist is about 31" inches. Would I be losing a tight fit?

    Yes, The minimum waist size is 34" for the FLYCAM Flowline Master with Pro Vest for Camera & Gimbals the fit would be very loose with your waist size.

  • Are these supports suitable for Digital SLR camera with 600mm lens ?

    Yes. It is suitable for the camera setups weighing from 4kg to 12kg.

  • Hello, Is there no other way for me to have more headroom with my Flycam Flowline Master? I have everything buckled up correctly to where all of the weight is at my hips. However, with my camera (attached to the Flowline Placid), it leans so much that the top part is going over my head. Would changing my spring from blue to red make a difference? Looking forward to your response. Thank you! Best, Marlo

    The weighing capacity of the master flowline is 4-12kg, you should always use a blue spring.

x