Skip to content

Free Fast Shipping to Canada (Except Pre-order Products)

Free Fast Shipping to Canada (Except Pre-order Products)

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

With 180° Rotation

Sold out
Original price CAD 606.00 - Original price CAD 606.00
Original price
CAD 606.00
CAD 606.00 - CAD 606.00
Current price CAD 606.00
SKU : B-FLCM-FLN-01

AT A GLANCE


Payload
3-7.5 kg
Support Arm Rotation
180°
Waist hip strap length
Min-Max: 81 cm - 125 cm
Compatible With
Camera and Gimbals
Best For
Moving Shots
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

Flycam Flowline Starter for Camera & Gimbals

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand, extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
Note: It is recommended to attach the minimum required weight (3kg / 6lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

02.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles. The Support Rope also adds an additional point of Contact which reduces Vibrations.

03.

THE MOST VERSATILE CAMERA SUPPORT RIG
This Flowline System has been designed to accommodate all Camera and Gimbal Setups between 3kg to 7.5kg (6lb / 16lb).
The spring tension can be adjusted to balance the load placed on the Support Rope by turning the knob present on the back of the rig.

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

SPECIFICATIONS

Payload Capacity 

Min - Max: 3kg - 7.5kg (6lb - 16lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Support Arm Rotation

  180°

Flowline Weight

  Complete 3.6kg / 8lb

Height 

  Mounted: 100cm | 39.4inch
  Folded: 64cm

Suspension Line

  Material: 3mm Nylon
  Length (Rope): 152.5cm | 60inch When fully stretched

Top Bar 

  Length: 480mm
  Rotation: 180°

Waist hip strap length

  Min-Max: 81cm - 125cm (32 inch - 49 inch)

Dimensions

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

Product Weight (Without Packing)

  3.8kg / 8.3lb

Product Volumetric Weight (With Packing)

  18.4kg / 40.5lb

IN THE BOX

Flycam Basic Flowline with 180° Rotation
Bag

USER MANUAL


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products





  • What camera weight can the Flycam Flowline Starter support?

    The system supports camera and gimbal setups between 3kg and 7.5kg (6lb–16lb)

  • Can beginners use the Flycam Flowline Starter easily?

    Yes, the system features simple spring tension adjustment and a straightforward setup suitable for beginners and professionals.

  • How is camera weight balanced on the Flowline Starter?

    The spring tension knob on the back adjusts resistance to balance the camera weight suspended from the support rope.

  • Can the camera move freely while using the Flowline Starter?

    Yes, the top bar features 180° rotation.

  • Can the Flycam Flowline Starter be used with gimbals?

    Yes, the Flowline Starter supports most gimbals and camera rigs within the 3–7.5kg payload range.

  • What is the minimum camera weight required for proper operation?

    A minimum setup weight of 3kg (6lb) is recommended to properly tension the balancing support rope.

  • what if I will use it with more weight (8kg or 9kg) than it supports? It's possible or what's the risks?

    The weight capacity of B-FLCM-FLN-01 is 3-7.5 kg / 6-16 lb and would recommend to use the camera setup weight in this range to get the perfect and steadier shots.

  • If a customer has a 9-10 lb payload is there a way to adjust the tension so the camera does not keep pulling up?

    Yes, the tension on the Flycam Flowline can be adjusted as shown in the below video:
    https://www.youtube.com/watch?v=GC9uF0SXkz8&t=82s

  • What is the use of washers and Velcro you provide with the Flycam flowline starter? You have not shown any use of them

    Regarding your query on the washer and velcro, I would like to inform you that we provide an extra washer so that it can be used with the knob on the back mechanism of the flowline when required.
    For Velcro, it is used to fasten the hook to the arm during packaging (when it is not in use). This prevents it from moving around and getting damaged.

  • What is the size and length of the marked knob of Basic Flowline Stabilizing Support Vest with 180¡?

    M4 X 12MM

  • Hello! Is it possible to lock position of the bar so it will not rotate?

    The Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb) will rotate at 180°. If you want to make the bar static in one position/ direction then you need to hold the camera manually.

Customer Reviews
5.0 Based on 1 Reviews
5 ★
100% 
1
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
JE
10/15/2024
Joey E.

Game Changer.

I finally pulled the trigger to get this for my shooting needs. Admittedly, I hesitated to invest in this despite having known the advantages for years. It takes the weight off my shoulders and allows a nearly hand-free navigation of my rig. I have a BMPCC6K Pro with a Canon 24-105 on a decent shoulder rig, and I shoot a lot of things that require a lot of dynamics. So, I've set up a wireless follow-focus trigger on my left finger while I "pull" zoom on my right hand with a manual focus wheel. The result is an ENG-style gathering with a cinema camera that works incredibly well for what I do. This vest is not just for one type of shooting; it's versatile and can adapt to different shooting styles. This FLYCAM takes all the weight and allows it to float above me so I can focus on pulling both my focus ring and zoom. If you're a single-shooter, this starter vest is well worth the investment, especially considering that others are double or even triple the price.

x