Skip to content

Our Biggest Sale of the Year, 15% Off Everything. Auto Applied at Checkout.

15% OFF. Auto Applied at Checkout.

Flycam Starter Female Flowline Body Support Rig for Camera & Gimbals

Payload: 3-7.5kg (6-16lb)

Original price CAD 490.00 - Original price CAD 566.00
Original price
CAD 566.00
CAD 490.00 - CAD 566.00
Current price CAD 566.00
SKU : B-FLCM-FLN-FM

Most Comfortable Female Body Rig

To Support Your Extensive Camera Handheld Work!

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
Flycam brings you the most comfortable Female Flowline to take the weight off your shoulders and arms and redistribute it across the entire back.
We understand that extended handheld camerawork proves to be a backbreaker, yet this is the most Comfortable and Breathable Body Harness.
NOTE:It is recommended to attach the minimum required weight (3kg/6lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

02.

SMOOTHER, STEADIER SHOTS!
The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for a longer duration without fatigue, resulting in smoother and Steadier Shots.
The Top Bar with 180° Rotation capability allows easy camera movements at different angles.
The Support Rope also adds an additional point of contact that reduces Vibrations.

03.

THE MOST VERSATILE CAMERA SUPPORT RIG
This Female Flowline System comes in two sizes for different body types.
It easily accommodates all Camera and Gimbal Setups between 3 to 7.5kg (6 to 16lb).
The spring tension is adjustable to balance the load placed on the Support Rope by turning the knob present on the back of rig.

IN-ACTION VIDEOS

SPECIFICATIONS

B-FLCM-FLN-FM (S, M, L)

Payload Capacity

Min-Max: 3kg - 7.5kg (6lb - 16lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Arm Support Rotation

  180°

Flowline Height

  Mounted: 100cm | 39.4inch
  Folded: 60cm | 23.6inch

Flowline Weight

  4.6kg / 10.14lb

Suspension Line

  Material: 3mm Nylon
  Length (Rope):152.5cm | 60inch when fully stretched

Top Bar Length

  560mm

Top Bar Rotation

  180°

Waist Size

  26inch - 32inch

Bust Size

  34inch - 38inch

Product  Weight (Without Packing)

  4.8kg / 10.5lb

Product Volumetric Weight (With Packing)

  19.4kg / 42.7lb

B-FLCM-FLN-FM-01 ( XL, XXL)

Payload Capacity

Min-Max: 3kg - 7.5kg (6lb - 16lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Arm Support Rotation

  180°

Flowline Height

  Mounted: 100cm | 39.4inch
  Folded: 60cm | 23.6inch

Flowline Weight

  4.8kg / 10.58lb

Suspension Line

  Material: 3mm Nylon
  Length(Rope): 152.5cm | 60inch when fully stretched

Top Bar Length

  560mm

Top Bar Rotation

  180°

Waist Size

  32inch - 38inch

Bust Size

  42inch - 46inch

Product Weight (Without Packing)

  5.1kg / 11.2lb

Product Volumetric Weight (With Packing)

  22.9kg / 50.4lb

IN THE BOX

B-FLCM-FLN-FM (S,M,L)

Flycam Starter Female Flowline for Small, Medium and Large Size
Bag Packing

B-FLCM-FLN-FM-01 (XL,XXL)

Flycam Starter Female Flowline for XL and XXL Size
Bag Packing


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products





  • \"I’m confused why this and some of the other vests say “female” what does this mean? What are the differences? Is it just the dimensions? I’m a man, do you think this fly cam will work for me?\"

    We would like to inform you that, Flycam Starter Female Flowline Body Support Rig (B-FLCM-FLN-FM) is specially designed for females and is different from Flycam Flowline Starter (B-FLCM-FLN-01) in terms of the varying bust size.
    We would recommend you purchase the Flycam Flowline Starter (B-FLCM-FLN-01) instead.

x