Skip to content

Free Fast Shipping to Canada (Except Pre-order Products)

Free Fast Shipping to Canada (Except Pre-order Products)

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

With 180° Rotation

Original price CAD 533.00 - Original price CAD 533.00
Original price
CAD 533.00
CAD 533.00 - CAD 533.00
Current price CAD 533.00
SKU : B-FLCM-FLN-01

Flycam Flowline Starter for Camera & Gimbals

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand, extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
Note: It is recommended to attach the minimum required weight (3 kg / 6.6 lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)
Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

02.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles. The Support Rope also adds an additional point of Contact which reduces Vibrations.

03.

THE MOST VERSATILE CAMERA SUPPORT RIG
This Flowline System has been designed to accommodate all Camera and Gimbal Setups between 3kg to 7.5kg (6lb/16lb).
The spring tension can be adjusted to balance the load placed on the Support Rope by turning the knob present on the back of the rig.

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

SPECIFICATIONS

Support Arm Rotation

  180°

Flowline Weight

  Complete 3.6 kg (8 lb)

Height

  Mounted: 100cm
  Folded: 64cm

Minimum Load Capacity

  3 kg / 6.6 lb

Maximum Load Capacity

  7.5 kg / 16.53 lb

Suspension line length (Rope)

  152.5 cm (60 in.) when fully stretched

Suspension Line Material

  3mm Nylon

Top Bar Length

  480mm

Top Bar Rotation

  180°

Min. waist hip strap length

  81 cm (32 in)

Max. waist hip strap length

  125 cm (49 in)

Dimensions

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

Product Weight (Without Packing)

  3.8kg / 8.3lb

Product Volumetric Weight (With Packing)

  11.5kg / 25.4lb

IN THE BOX

Flycam Basic Flowline with 180° Rotation
Bag Packing

USER MANUAL


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products





  • If a customer has a 9-10 lb payload is there a way to adjust the tension so the camera does not keep pulling up?

    Yes, the tension on the Flycam Flowline can be adjusted as shown in the below video:
    https://www.youtube.com/watch?v=GC9uF0SXkz8&t=82s

  • What is the use of washers and Velcro you provide with the Flycam flowline starter? You have not shown any use of them

    Regarding your query on the washer and velcro, I would like to inform you that we provide an extra washer so that it can be used with the knob on the back mechanism of the flowline when required.
    For Velcro, it is used to fasten the hook to the arm during packaging (when it is not in use). This prevents it from moving around and getting damaged.

  • What are the dimensions of Flycam Basic Flowline Bag?

    Below is the image showing the dimensions of Flycam Basic Flowline with 180° Rotation B-FLCM-FLN-01
    https://prnt.sc/tvlFMxlZ_5QS

  • What is the size and length of the marked knob of Basic Flowline Stabilizing Support Vest with 180¡?

    M4 X 12MM

  • Hello! Is it possible to lock position of the bar so it will not rotate?

    The Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb) will rotate at 180°. If you want to make the bar static in one position/ direction then you need to hold the camera manually.

Customer Reviews
5.0 Based on 1 Reviews
5 ★
100% 
1
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
JE
10/15/2024
Joey E.

Game Changer.

I finally pulled the trigger to get this for my shooting needs. Admittedly, I hesitated to invest in this despite having known the advantages for years. It takes the weight off my shoulders and allows a nearly hand-free navigation of my rig. I have a BMPCC6K Pro with a Canon 24-105 on a decent shoulder rig, and I shoot a lot of things that require a lot of dynamics. So, I've set up a wireless follow-focus trigger on my left finger while I "pull" zoom on my right hand with a manual focus wheel. The result is an ENG-style gathering with a cinema camera that works incredibly well for what I do. This vest is not just for one type of shooting; it's versatile and can adapt to different shooting styles. This FLYCAM takes all the weight and allows it to float above me so I can focus on pulling both my focus ring and zoom. If you're a single-shooter, this starter vest is well worth the investment, especially considering that others are double or even triple the price.

x