Skip to content

Free Fast Shipping to Canada (Except Pre-order Products)

Free Fast Shipping to Canada (Except Pre-order Products)

Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)

Body Support Rig w 180° Rotation. For Filmmakers & Videographers.

Save 18% Save 18%
Original price CAD 1,076.00
Original price CAD 1,076.00 - Original price CAD 1,076.00
Original price CAD 1,076.00
Current price CAD 878.00
CAD 878.00 - CAD 878.00
Current price CAD 878.00
SKU : FLCM-FLN-PA-01

Assured Smooth Stabilized Shots & Comfort All Day Long!

01.

BACKBREAKER HAND-HELD WORK – NOT ANYMORE
We understand extended handheld camerawork can prove to be a backbreaker. But if you have a Body Support rig, it solves your problem up to a great extent.
Flycam Flowline rig takes the weight off your shoulders & arms and distributes it across the entire back which makes it convenient for you to shoot for a longer period without getting tired.
As there is less pressure on your arms now, you’ll be able to capture more stable & smoother shots.
Note: It is recommended to attach the minimum required weight (5kg / 11lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)

02.

ERGONOMIC, ADAPTABLE & EASY TO BALANCE
An ergonomic & breathable harness stays soft on your body & makes you feel comfortable & stress-free all day long. You feel comfortable & stress-free all day long due to its ergonomic & breathable soft harness. It gives you the freedom to capture a shot from any desired angle as it rotates 180°. This Flowline System accommodates all Camera and Gimbal Setups between 3kg to 7.5kg (6lb-16lb). You can adjust the spring tension to balance the setup by easily turning the knob present on the rig's back.

 

03.

PERFECT VERTICAL STABILIZATION!
The Flycam Placid 2-axis Spring Arm is a perfect companion for your flowline rig in getting a Smooth Shot. It adds an additional vertical stabilization & eliminates errors caused by the operator’s motion. It comes with two springs for variable payloads. You can interchange them as per the weight of your camera setup. You can balance the setup & adjust the spring tension by adjustment knob.

Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)
Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)

04.

QUALITY THAT LASTS LONG
The body vest is made up of strong yet ergonomic fabric that has minimal wear & tears & stays for long.
The arm pole of the flowline rig & the placid arm are constructed with high-grade Aluminum Alloy that ensures stability, strength & durability.
The Springs used in the Placid are made up of Stainless Steel that certifies complete corrosion resistance & long-term value.

 

IN-ACTION VIDEOS

SPECIFICATIONS

FLOWLINE

Flowline Weight

  With Liver Jacket :- 3.6kg / 8lb
  Without Lever Jacket :- 3.8kg / 8.3lb

Height

  Mounted: 100 cm  
  Folded: 60 cm

Suspension line

  length (Rope) :- 152.5 cm
  Material :- 3mm Nylon

Top Bar Length

  With Liver Jacket :- 560mm
  Without Lever Jacket :- 480mm

Support Arm Rotation

  180°

Waist hip strap length

  Min - Max: 81cm - 125cm | 32inch - 49inch

PLACID ARM

Construction

  High-grade Aluminum, Carbon Steel, Stainless Steel, EPDM rubber

Height

  205mm

Width

  395 mm

Depth

  65mm

Tilt Range

  40° Up/ Down

Weight of product

  1.80kg / 3.96lb

Foam Packing Dimension

  LxWxH : 42cmx20.5cmx12cm

Weight(With packing)

  2.40kg/5.29lb

IN THE BOX

FLYCAM Basic Flowline with 180° Rotation
FLYCAM Flowline Placid Two Axis Spring Arm (FLCM-FLN-PLA)
2 x Tension Spring
Safety shock cord
Bag


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products





  • Will the placid arm work as an stabilizer?

    Yes it will. It works to help minimize both vertical and side-to-side vibration.

  • If you pull down camera to get a lower shot, shouldn't the "string" go back up when releasing weight? Or is it setting height and that's where it is? I know the Swedish Easy Rig the string/cable will go up and down.

    Yes, The cord is tensioned and will retract, and adjust to the level of your camera payload. The cord will retract as you raise your camera payload.

  • Is it suitable to use it with a camera setup less than 6.6 Ib ?

    No, it will not work effectively with cameras/camera rigs that weigh less than 6.6lbs.

  • Is the placid arm already affixed to the vest & system? I'm asking so I wouldn't have to do it myself.

    Yes, the Placid arm comes assembled.

  • What if I will use it with more weight (8kg or 9kg) than it supports? It's possible or what's the risks?

    The weight capacity of B-FLCM-FLN-01 is 5-7.5kg/11–16lb and would recommend to use the camera setup weight in this range to get the perfect and steadier shots.

  • What is the size and length of the marked knob of Basic Flowline Stabilizing Support Vest with 180¡?

    M4 X 12MM

Customer Reviews
0.0 Based on 0 Reviews
5 ★
0% 
0
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
x