Skip to content

Free Fast Shipping to Canada (Except Pre-order Products)

Free Fast Shipping to Canada (Except Pre-order Products)

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)

Original price CAD 1,283.00 - Original price CAD 1,349.00
Original price CAD 1,283.00
CAD 1,349.00
CAD 1,197.00 - CAD 1,349.00
Current price CAD 1,349.00
SKU : FLCM-FLN-MSTR

Flycam Flowline Master Professional Support For Camera & Gimbals

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline Master takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
NOTE: It is recommended to attach the minimum required weight (4kg / 8.81lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)
Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)

02.

THE FLOWLINE MASTER VEST
Ergonomically designed Flowline Master Vest ensures more support around the Shoulders and Back, allowing you to mount large setups and shoot comfortably for a longer duration. It has a flexible belt system & adjustable vest rods on sides, which will enable a comfortable fit for all body types.

03.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Support Rope also adds a point of Contact which reduces Vibrations.

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)
Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)

04.

ADAPTIVE CAMERA SUPPORT RIG
This Flowline Master System fits multiple Camera and Gimbal Setups between the weight range of 4kg/9lbs to 12kg/27lbs.You can even adjust the spring tension to balance the load placed on the Support Rope by turning the knob present on the back of the rig.
Also, the top bar allows for 180° & 360° rotation to capture shots with incredible freedom of movement.

05.

BUILT TO LAST
We know set life can take a toll on your gear. Built with the highest quality materials, the Flycam Flowline Master is sure to last you a lifetime. It comes in a high-quality protective bag that lets you easily carry it with you around the world.

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)

IN-ACTION VIDEOS

SPECIFICATIONS

FLCM-FLN-MSTR

Support Arm Rotation

  360°

Knob Type

  Anti Slip Ratchet Knob

Height Mounted

  100cm (39.4in) Folded: 60cm (23.6in)

Minimum Load Capacity

  4kg (8.81lb)

Maximum Load capacity

  12kg (26.45lb)

Suspension Line Material

  3mm Nylon

Suspension Line Height (Rope)

  152.5cm (60in.) when fully stretched

Top Bar Length Including Extension

  46cm(18in)

Top Bar Length Excluding Extension

  32cm(13in)

Min. waist hip strap length

  81cm (32in)

Max. waist hip strap length

  125cm (49in)

Extension Length

  14cm (5.5in)

Product Weight (Without Packing)

  4.26 kg / 9.39 lb

IN THE BOX

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)
Packing Bag

FLCM-FLN-MSTR-02

Payload Capacity

Min-Max: 4kg - 12kg (9lb - 27lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Support Arm Rotation

  180°

Knob Type

  Anti Slip Ratchet Knob

Height 

  Mounted: 100cm | 39.4inch
  Folded: 60cm | 23.6inch

Suspension Line

  Material: 3mm Nylon
  Length (Rope): 152.5cm | 60inch when fully stretched

Top Bar 

   Length Including Extension: 46cm | 18inch
   Length Excluding Extension: 32cm | 13inch

Waist hip strap length

  Min - Max: 81cm - 125cm (32inch - 49inch)

Extension Length

  14cm | 5.5inch

Product Weight (without packing)

  4.7kg / 10.5lb

USER MANUAL


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products





  • "In manual it doesn't actually say what the big knob on the hook does https://prnt.sc/YUs27G3GffYR".

    You can adjust the camera position by sliding the knob forward or backward. Once you have set it to your desired position, secure it by locking it with the knob.

  • what is the difference between 180° and 360°?

    The only difference between the 180° and 360° model is the support arm rotation.

Customer Reviews
5.0 Based on 4 Reviews
5 ★
100% 
4
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
A Proaim Customer
OA
05/13/2022
Osman A.
Canada Canada

Excellent quality and customer service

First I purchased the Proaim Polaris Dolly ( Dana Dolly Match) and I was extremely happy with it. I used it for commercials and films. The built quality was amazing. Proaim is not selling Chinese knock of cheap stuff. I can tell that. All of their stuff is high-quality, solid stuff. After that, I purchased the Flowline Master series for my Ursa Mini Pro 4.6K G2 and 4.5LB cine lens combo. My setup is about 20lb and Flowline Master had no problem handling it. Now the next purchase for me will be the Proaim Zest Vii Steadycam for my setup. The quality on the Flowline master series is amazing but the Vest on the Steadycam Zest is a bit worrying me. I will have to look at more reviews.

AB
05/31/2021
adisa b.

Filmmaking with ease

This is my favorite piece of stablizing equipment.

MD
04/18/2020
Malyssa D.

AWESOME BUY

Great for cinematographers that like to go handle

JB
06/26/2019
Jiwon B.

Works Well!

I've never used an easyrig but this feels very secure and holds the weight of a moderately heavy rig nicely.

x